FREE FINANCIAL EDUCATION
Rebalancing a futures hedge
Recompute target contracts after portfolio and futures values change.
What you will learn
Prerequisites: Beta-adjusted hedging and current futures notional.
- Recompute target contracts after portfolio and futures values change.
- Measure current residual beta before sending an adjustment.
- Specify a rebalancing policy that balances drift and transaction cost.
Mechanism and decision rules
A hedge sized at one date can drift as the cash portfolio changes value, its composition or beta changes, and the futures price moves. The number of contracts may be unchanged while the monetary hedge ratio is different. Rebalancing begins by recalculating the current exposure, not by repeating the original entry calculation with stale values.
For a cash portfolio with value V and beta b, n short index futures of current notional F×M leave approximate residual beta b−nFM/V under the same one-factor model. Compare that result with the stated target. The required adjustment is target total contracts minus contracts actually held, after accounting for pending orders. A separate order to add the full target again would double the intended adjustment.
A rebalancing policy can use fixed review times, a tolerance band or material changes in composition. More frequent adjustment can reduce modeled drift but increases spreads, fees and operational exposure. A tolerance rule should be stated before evaluating performance. Changes in the hedge estimate may reflect noisy beta data rather than a genuine economic shift, so review the input quality as well as the arithmetic.
Worked example · synthetic data
A synthetic ₹10,000,000 portfolio initially has beta 1.0. With futures at 25,000 and multiplier ₹20, one contract is ₹500,000. A target beta of 0.5 requires ten short contracts.
Later, portfolio value is ₹8,000,000, estimated beta is 1.2 and futures are 20,000, making each contract ₹400,000. The existing ten shorts cover ₹4,000,000 and leave residual beta 1.2−4/8 = 0.7. To restore target beta 0.5, total shorts should be (1.2−0.5)×8,000,000/400,000 = 14. The required trade is four additional shorts, not fourteen additional shorts.
Failure modes and limits
The formula does not prove that immediate trading is preferable to tolerating some drift. Beta can be unstable, and spread or margin conditions may make adjustment costly. Rollover can change contract identity and liquidity while preserving roughly similar sensitivity. Reconcile pending fills before recomputing the order, and consider how the adjustment changes the funding reserve.
Practice case
Current portfolio value is ₹6,000,000 and beta 0.9. Six futures are short, each with ₹300,000 current notional. Target beta is 0.3. Calculate current residual beta, target total shorts and incremental adjustment.
Reveal the worked answer
Existing hedge notional is ₹1,800,000, so residual beta is 0.9−1.8/6 = 0.6. Target total shorts are (0.9−0.3)×6,000,000/300,000 = 12. Add six short contracts after checking actual and pending positions. Twelve is the target total, not the size of a new order on top of the six already held.
Check your understanding
Sources and next steps
The lesson, calculations and synthetic cases are original educational material. References explain underlying contract or chart conventions; none validates the profitability of a trading rule. Actual contract specifications, settlement obligations and charges must be checked before trading.
Explore OHLCV data in the chart lab · Explore volume-at-price and TPO data · Practice library